3-21-2008: DANDE Critical Design Review.

2-18-2008: DANDE transmitter prototype
arrives.

2-11-2008: DANDE Structure and MGSE "cage".

2-4-2008: AJ Hoyt from SpaceDev, oversees a
Lightband Adapter Bracket deployment test.

1-28-2008: EDU primary structure fit-checks.

1-16-2008: Bruce Davis prepares the Equatorial
Plate.

1-09-2008: More testing at First RF.

12-18-2007: DANDE late night requirement scrub.

12-14-2007: DANDE C&DH team passes review (from left: Brandon
Gilles, James Gorman, Eric McIntire).

12-12-2007: DANDE tests patch antennas at First RF
corporation.

11-28-2007: DANDE Master Wiring Diagram.

11-14-2007: Dr. Fred Herrero visits the DANDE team to help
finalize design requirements.

11-07-2007: Delrin ring fit-check with EDU spheres

10-31-2007: Delrin ring fit-check with EDU spheres

10-24-2007: subsystem AVR development board
testing for Flat-Sat

10-17-2007: Delrin ring manufacturing |